What Does elektroda Mean?
Blow-out failure: failure is characterized by the lateral spalling of concrete within the proximity of the anchor's head. This sort of failure occurs for anchors (prevalently Solid-in-location) mounted around the sting of the concrete aspect.Dokumentasi: Simpan catatan tentang pemasangan dan pemeriksaan angkur. Dokumentasi ini penting untuk audit k